Do I need a permit to add a subpanel?

Usually needs a permit

A subpanel means a new feeder and new distribution, not a repair — that is permit work essentially everywhere, and the inspection exists to catch one specific mistake.

What changes the answer

These thresholds come from the model code and are commonly amended locally, which is usually where people get caught.

Why it matters

The mistake this inspection is looking for is neutrals and grounds bonded together in the subpanel. It works, everything turns on, and normal current now flows on the ground path and on any metal it touches — including the water pipes. Nothing about that is visible once the cover is back on.

Confirm the requirement with the authority that would issue the permit before deciding.

The version of this people actually ask

Do I need a permit to add a subpanel in my garage or shop?

Yes in nearly all jurisdictions. A subpanel is a feeder, an overcurrent device and a grounding arrangement, and the two things most often got wrong are invisible once the cover is on: neutrals and grounds have to be separated downstream of the service disconnect, and a detached building needs its own grounding electrode. Both are silent failures that only matter during a fault.

Do I need a permit to run power to a detached garage or shed?

Yes, and it is a bigger item than the panel itself. The feeder is usually buried, so burial depth, conductor type and sizing over the run length, and the disconnecting means at the building all come into scope. An otherwise permit-exempt shed does not make the wiring to it exempt.

Does my subpanel need a four-wire feeder?

A modern feeder to a subpanel carries two hots, a neutral and a separate equipment grounding conductor, with the neutral isolated from the enclosure at the subpanel. Three-wire feeders to detached buildings were allowed under older code editions and plenty exist, but that allowance was removed, and an existing installation being legal when built does not carry over to new work.

This is the typical rule, not your answer

This is the typical rule in the United States and not a decision about your property — permitting is run by more than 22,000 separate authorities and any of them can amend the code it adopts, so confirm with your local building department before you start. Put a ZIP in to see what applies in that state, and how to reach the office that decides.

Electrical permits are required under the adopted NEC / IRC Chapter 34; subpanels are not in the R105.2 exemption list. Neutrals and grounds must be separated downstream of the service disconnect — NEC Article 408 and 250.24(A)(5) — and a detached building fed by a feeder needs its own grounding electrode under NEC 250.32.

Add a subpanel state by state

Which building code a state adopts, and whether it binds the whole state or leaves it to each city, changes how far the rule above gets you. These pages carry that, plus the county building departments we have verified in each.

Other projects